THE LIGHT WEIGHT FORMWORK IS PLACED AROUND THE EDGE OF THE HOLE TO PROVIDE A FINISHING LINE.

FORM

The in spray construction the formwork only needs to be strong enough to support the concrete during the spray.
The formwork provides the outside lines of the pool & also the top level for the concrete.
In this photo, the pool is lined with 25mm (1") polystryene as the pool will be heated, this saves about 30-50% on heating costs.

Photo courtesy:
Clearview Pools, Adelaide, Australia. Ph Mobile 0418300400


Return to Pool Construction Home Page

Web Page written by:
Victor K de Fontenay © Sept 1998
Page Last updated 3.00pm 27th Sept 1998